Capital Project to be considered by the community in May 2021

May 18, 2021

Thank you, Scotia-Glenville!

  • The $59.1 million 2021-22 S-G school budget was approved today by a vote of 741 to 203, a margin of 78.5% to 21.5%.
  • The $493,000 bus purchase proposal was approved by a vote of 740-204, a margin of 78.4 to 21.6%
  • The $12.8 million capital project was approved by a vote of 739 to 207, a 78.2% to 21.8% margin.

Board member David Massaro was re-elected with 783 votes and board member Hal Talbot was re-elected with 772 votes.


The community will consider a $12.8 million capital project during community voting on Tuesday, May 18. Voting will be held from 7 .m. to 9 p.m. in the B-wing gymnasium at the high school.

There will be no impact on the tax levy because of this project. The district retires debt every year and this would replace that retiring debt.

This capital project includes new furnaces and roofs, replacing lead water lines and public address systems and a host of other upgrades at all six school buildings as well as other locations.


Major Scope of Work for the May 18 capital project:

Glen-Worden Elementary – $3,542,510

• Roof Replacement
• Heating System conversion from Steam to Hot Water/Boiler Replacement
• Canopy improvements
• Sidewalk, ramps, railing replacements
• Masonry repairs
• PA System replacement

High School – $3,002,950

• Replace galvanized domestic water piping and recirculation pumps
• Replacement of aging mechanical units
• PA System replacement
• Area ‘C’ sidewalk replacement/stormwater catch basin repair

Glendaal Elementary – $2,542,669

• Roof replacement
• Exterior door replacements
• Parking lot reconstruction, sidewalk repair, ramp railing repair
• Masonry repairs
• PA System replacement

Sacandaga Elementary – $1,728,452

• Sidewalk, steps, ramps, railing replacement
• Replacement of aging mechanical units and upgrade controls
• PA System replacement

Middle School – $1,580,817

• Parking reconstruction, sidewalk replacement, bus drive improvements
• Small gym rooftop mechanical unit replacement
• PA System replacement

Lincoln Elementary – $253,962

• Sidewalk repair
• PA System replacement

Field House – $76,382

• Abatement of pipes in ceiling
• Exterior door replacement

District Office – $39,051

• Sidewalk install

Maintenance Building – $33,207

• Chimney repair